The Solution
NCS Technology project managed the entire room transformation, which included a full strip out, installation of new electrics, plumbing, painting and decoration during the summer break.
Space was maximised by repositioning the existing data cabinet outside of the room. A contemporary, raised seating area was constructed and a new 75” Clevertouch interactive screen was installed. A bespoke cabinet was created to house, protect and charge the school’s existing laptops and iPads.
LED flat panels replaced the old ceiling lights and were fitted with Dali dimming to enable teachers to create different moods depending on a lesson’s theme.
Every aspect of the space was considered to enhance learning opportunities – one wall was even turned into a green screen to make the space suitable for creating films and animations.